Waterproofing

Window Caulking & Joint Sealing

Window perimeter caulking, expansion joints, coping stone joints and waterproof crack sealing.

500+
Violations Cleared
24hr
Emergency Response
5
NYC Boroughs Served
15+
Years Experience
Service Overview

What We Do

Sealant is the cheapest waterproofing on a building and the first thing to fail. A ten-year-old bead has usually lost adhesion at one edge, which is all wind-driven rain needs. We cut out the old sealant completely, install backer rod to the correct depth, and tool a new joint that can actually move without tearing.

Almost every sealant failure we are called to fix is a joint-design failure, not a product failure. Caulk smeared over an old bead has nothing to bond to. A joint filled solid with no backer rod grips three sides and tears itself apart on the first cold night. A joint sealed at the wrong width-to-depth ratio cannot accommodate the movement the building actually makes. We do it the way the sealant manufacturers specify — full removal, clean and prime the substrate, backer rod at the right depth, correct joint profile, tooled concave finish — using silicones and polyurethanes rated for the movement and the substrate. It is unglamorous work that quietly prevents a very large number of leaks.

  • Full window & door perimeter sealant replacement
  • Expansion joint resealing — vertical & horizontal
  • Coping stone & parapet joint raking and resealing
  • Backer rod installation & correct joint profiling
  • Waterproof crack sealing — routed, filled & tooled
  • Sealant systems matched to substrate & movement rating
Our Standards

What Every ECO World Job Includes

These aren't extras — they're the baseline on every project we take on.

Fully Licensed & Insured

Every crew member is NYC-licensed in their trade and covered by $2M general liability and workers' comp.

Permit-First Policy

We file all required DOB permits before work begins — no shortcuts that create violations down the road.

On-Time Completion

We set realistic schedules and stick to them. You'll get a detailed timeline before we lift a tool.

Dedicated Point of Contact

One project manager owns your job from quote to closeout — no being bounced between crews.

Written Warranty

All trade work carries a minimum 1-year labor warranty. Manufacturer material warranties transferred to you.

Clean Job Sites

We protect your property daily — floor coverings, dust barriers, and thorough cleanup at end of every shift.

How It Works

Our Step-by-Step Process

Clear and stress-free from first call to final sign-off.

1

Joint Survey

We inspect every joint on the elevation, note adhesion failures, gaps, and previous caulk-over repairs, and measure the movement the joint has to handle.

2

Full Removal & Prep

Old sealant is cut out completely — not caulked over — and the joint faces are cleaned and primed so the new bead bonds to sound substrate.

3

Backer Rod & Sealant

Closed-cell backer rod is set to the correct depth, then the joint is filled with the specified silicone or polyurethane and tooled to a concave profile.

4

Water Test & Documentation

We spray-test representative joints under controlled conditions and give you photo documentation of every elevation we sealed.

FAQ

Common Questions

Ready to get started?

Free estimates, fast responses, and zero-surprise pricing — every time.